The roads that were repaired by the Jefferson County Road Department were as follows:
Sept. 2
– Patching Crew: Patched shoulders on Clint Henderson Road with hot mix asphalt.
– Culvert Crew: Installed a 12-foot by 20-foot metal pipe on NCTR Road and covered it with 10 yards of SB2. Cleaned out a driveway culvert on River Road and Ashley Road.
– Truck Driver: Haled 10 yards of SB2 to NCTR Road.
Independent reporting for Pine Bluff & Jefferson County since 1879.
– Grader Operator: Graded State Farm Road, Morgan Road and Gilliand Road.
– Boom Mower: Cut right of way on Clint Henderson Road, Darby Lane, Lowman Road, Ferguson Road, Summit Road, Luckwood Road and Rayhan Road.
– Sign Shop: Road signs were put up on Gaddy Koonce Road. A stop sign was put up on Whiteville Road and the rest of the day was spent making signs.
Sept. 3
-Patching Crew: Filled potholes on Wilderness Road, Gaddy Koonce Road and Second Street in Altheimer.
– Culvert Crew: Installed a 12-foot by 24-foot driveway culvert on St. Raphael Road and covered it with 20 yards of SB2.
– Set Up Crew: Dug up soft spots on Wilbur West Road for future resurfacing.
– Truck Driver: Hauled 20 yards of SB2 to st. Raphael Road.
– Grader Operator: Graded Maynard Road and Walker Road.
– Boom Mower: Cut right of way on Payton Road, Tall Timber Lane, North and South Ramick Road, Tall Oak Road and Tall Pine Trail.
– Sign shop: Put stop sign up on Wilderness Road.
Sept. 4
– Patching Crew: Filled potholes on Raymick Road, Gaddy Koonce Road, Snyder Road and Brown Cemetery Road.
– Set Up Crew: Dug out soft spots on Wilbur West Road and Dvoky Road making it ready for future resurfacing.
– Grader Operator: Graded Sell Davis Road, Gibb Anderson Road and Grider Field Road.
– Boom Mower: Cut right of way on Lanni Lane.
Jefferson County Recycling Report
– Brought in nine tire boxes, four cardboard boxes and one trash box.
– Brought three trash trailers in, sent three trash trailers out.
– Jefferson County brought in 44.79 tons of tires. Get Rid of It/Waste Management brought in 20.34 tons of tires.
– Continued operation of the new recycling center.